California Bids > Bid Detail
Water Line Replacement for 2024 Roads Program
Agency: | Turlock |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD17105410924156665 |
Posted Date: | Mar 22, 2024 |
Due Date: | Apr 19, 2024 |
Source: | https://www.turlock.ca.us/capi... |
Water Line Replacement for 2024 Roads Program
The work consists, in general of: installing 5,417 lineal feet of new PVC water main pipe, new water service laterals to customers along the alignment of the new water main pipe, abandoning the existing water main pipe in place, restoring the trenches, and other associated work. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans.
23-040 4/19/2024 $3,432,500.00 A $120.00 Janine Lee, 209-668-6035 jlee@turlock.ca.us
View planholders list Download plans and specifications Print this project
The work consists, in general of: installing 5,417 lineal feet of new PVC water main pipe, new water service laterals to customers along the alignment of the new water main pipe, abandoning the existing water main pipe in place, restoring the trenches, and other associated work. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans.
23-040 4/19/2024 $3,432,500.00 A $120.00 Janine Lee, 209-668-6035 jlee@turlock.ca.us
View planholders list Download plans and specifications Print this project
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.