Mid-Wilshire Medical Office Building Seismic and Program Improvements
Agency: | UCLA Capital Programs |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15512653836243778 |
Posted Date: | Mar 7, 2024 |
Due Date: | Apr 2, 2024 |
Solicitation No: | 908736.01 |
Source: | https://www.capitalprograms.uc... |
Project Name | Mid-Wilshire Medical Office Building Seismic and Program Improvements |
Project Number | 908736.01 |
Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a CM at Risk contract are invited from prequalified CM/Contractors for the following work:
The 5 story Medical Office Building (MOB) is located at 5901 West Olympic Boulevard, approximately 6 miles east of the UCLA Campus and is approximately 95,607 GSF. The proposed project would include seismic improvements on all floor levels and interior tenant improvements of approximately 34,000 GSF of space on floors 1-3. The MOB has a current Seismic Performance Rating of V. Upon completion of the work, the MOB would achieve a Seismic Performance Rating of IV or better and bring the facility into compliance with the UC Seismic Safety Policy. The proposed seismic work will include the installation of approximately 52 seismic dampers placed at specified locations on the inside perimeter of the building's exterior walls. The dampers will be installed diagonally and attached at the bottom and top of the existing steel column bays requiring incidental fireproofing at beam and column modifications. Steel reinforcing plates will be added to existing steel beams and columns to support the installation of seismic damper brackets. Additional seismic reinforcing is required at the existing rooftop mechanical penthouse and at the building foundation at locations along the 1st floor seismic dampers. In addition to the seismic work, the tenant improvements will renovate existing vacated space on floors 1-3, including new interior partitions, floor and ceiling finishes, and new LED light fixtures. Work would also include the restoration of interior building finishes impacted by the installation of the seismic braces such as floor covering, gypsum board column enclosures, window treatments and ceiling finishes. Limited MEP upgrades will be performed to support new clinical spaces including digitally controlled VAV boxes, modified medium and low pressure ducting along with code compliant plumbing and electrical fixtures. Site and building accessibility improvements would include path of travel upgrades along the city sidewalk and building entrance, installation of new ADA handrails and guardrails at existing interior stairs. New accessible signage, restrooms and a drinking fountain are also anticipated. Fire and Life Safety upgrades will convert two existing dry standpipes to wet standpipes along with a new automatic fire sprinkler system on the floors 1-3 to support the new tenant improvements. The relocation of existing Fire Department Connection from east side of the building will be brought closer to Olympic Blvd. The work includes the installation of a fire water jockey pump and replacement of the emergency generator. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS LIST, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
Estimated Construction Cost | $39,100,000.00 |