California Bids > Bid Detail
Deferred Maintenance FY2021-22 - NRB / NRB Deep Energy Efficiency Project ADDENDUM NUMBER 1, 2 & 4
Agency: | UCLA Capital Programs |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15512591455549477 |
Posted Date: | Mar 20, 2024 |
Due Date: | Apr 23, 2024 |
Solicitation No: | 942418.01 / 943990.01 |
Source: | https://www.capitalprograms.uc... |
Project Name | Deferred Maintenance FY2021-22 – NRB / NRB Deep Energy Efficiency Project |
Project Number | 942418.01 / 943990.01 |
Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a Lump Sum contract are invited for the following work:
Replacement of obsolete Building Automation Controls and bladder actuated VAV Boxes. Provide new VAVs to all zone airflow devices and furnish system adjustments for airflow optimization; provide HVAC occupancy sensors and VAVs for exhaust system and adjustments for Airflow Optimization. A number of Energy Efficient Measures will also be considered as Alternates. Work shall also include patch and paint of walls and repair of all finishes impacted by the work. Work shall include all relevant air testing and balancing. The building will be occupied and operational during the performance of the work. Contractor shall coordinate work to minimize impact to operations. Contractor shall furnish temporary air to critical areas that cannot be vacated during performance of work. Work will be required during both business and non-business / after hours. Contractor shall conduct air surveys and provide Air Balance report prior to initiating scope of work listed above. Contractor shall provide documented air balance reports at completion of construction indicating achievement of air balance values listed in construction documents. No Hazardous Materials abatement in the scope of work. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS LIST, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
Estimated Construction Cost | $7,217,549.00 |
907512.01 |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.