California Bids > Bid Detail
UCLA Wilshire Center Elevator Modernization
Agency: | UCLA Capital Programs |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15512511803676309 |
Posted Date: | Apr 17, 2024 |
Due Date: | Apr 30, 2024 |
Solicitation No: | 943715.01 |
Source: | https://www.capitalprograms.uc... |
Project Name | UCLA Wilshire Center Elevator Modernization | ||
Project Number | 943715.01 | ||
Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
Provide all labor, materials, and equipment for the modernization of the two hydraulic passenger elevators, seven traction passenger elevators. Contractor shall submit deferred approval documents for Campus Official to approve and issue permit as described in Specification Sections 14 21 00 and 14 24 00. For Traction passenger elevators 1-7: New Microprocessor Controllers; New Hoist Motor Drives; New Traction Hoist Machines; New Hoist Ropes; New Seismic; New Deflector/Secondary Sheaves; New Governors; New Load Weighing; New Closed-Loop Door Operator, Tracks, and Relating Equipment; New Hall Door Hangers Track rollers; New Interlocks and Relating Equipment; New Car and Hall Fixtures; New Machine Room and Hoist way Wiring; New Traveling Cables; New Limit Switches; New Car Top Run Station; New Roller Guides; New Detector Edges; New Alarm Bells; New Electronic and Mechanical Pit Devices including associated New Seismic; New Fire Return System; New Hoistway Access Switches; New Communication Auto Dialer; New Car Top Ventilation Fan; New Elevator Control Panel; New Elevator Management System; New Ascending Car Over Speed; New Unintended Car Movement; all installation to be Compliant with ADA and CBC Chapter 11B – Accessibility to Public Buildings; New Compensating Chain (#7). For hydraulic passenger elevators 8 & 9: New Microprocessor Controllers; New Pump/Power Units with Speed Regulated Valves; New Closed-Loop Door Operator, Tracks, and Relating Equipment; New Hall Door Hangers Track rollers; New Interlocks and Relating Equipment; New In-Ground Jack Unit with PVC Liner; New Rupture Valve; New Car and Hall Fixtures; New Machine Room and Hoist way Wiring; New Traveling Cables; New Limit Switches; New Car Top Run Station; New Roller Guides; New Detector Edges; New Alarm Bells; New Electronic and Mechanical Pit Devices; New Fire Return System; New Car Communication; all installation to be Compliant with ADA and CBC Chapter 11B – Accessibility to Public Buildings; New Car Top Ventilation Fan; New Elevator Control Panel; New Elevator Management System. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
||
Estimated Construction Cost | $3,502,000.00 | ||
Ad for PQ Prime | |||
HM-FLOOR-JOC-2024 |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.