In general, the work consists of removing 384 LF of 6” VCP and replacing it with 8” PVC SDR-26, connecting sewer service laterals, utility trenching, trench patching, modifying manhole bases to match inverts, cutting and capping sewer laterals, constructing a valley gutter, an alley approach, CCTV inspection, a sewer bypass system and other associated work. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans.
19-48 2/22/2024 2:00 PM $251,210.00 A $52.00 Oscar Molina, 209-668-5366 omolina@turlock.ca.us
View planholders list Download plans and specifications Print this project
In general, the work consists of removing 384 LF of 6” VCP and replacing it with 8” PVC SDR-26, connecting sewer service laterals, utility trenching, trench patching, modifying manhole bases to match inverts, cutting and capping sewer laterals, constructing a valley gutter, an alley approach, CCTV inspection, a sewer bypass system and other associated work. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans.
19-48 2/22/2024 2:00 PM $251,210.00 A $52.00 Oscar Molina, 209-668-5366 omolina@turlock.ca.us
View planholders list Download plans and specifications Print this project
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.