In general, the proposed improvements consist of drainage repair on Encinal Canyon Road or adjacent properties. The improvements include the replacement of the existing CMP along with appurtenant work including but not limited to the installation of new storm drains, embankment reconstruction, excavation, clearing, grubbing, pavement removal, asphalt pavement, concrete curb and gutter, AC dike, concrete headwall, concrete apron, construct CMP, stamping, temporary traffic control, and all other appurtenant work included and shown in the Contract Documents.
|