Item # 1: ( 913 - 40 )
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the construction of PVC C-900 and DIP pipelines with associated valves and appurtenances and the installation of groundwater wells within the Chino Airport. This includes construction of approximately 17,500 LF of 16-inch, 12-inch, 8-inch and 6-inch C-900 Raw Water Pipeline, installation of fiber optic communication network, construction of five (5) groundwater pumping wells, equipping ten (10) ground water pumping wells, construction of five (5) monitoring wells, and construction of five (5) well sites with masonry building for electrical equipment, as shown on the Bid Documents, including the Plans and Specifications.
|
|
NIGP Code:
|
913-40
Construction, Pipeline
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|