P-1241 Low Altitude Radio Communication System Towers for Marine Air Ground Task Force Training Command, Twentynine Palms, CA
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159988622201793 |
Posted Date: | Feb 10, 2024 |
Due Date: | Mar 4, 2024 |
Source: | https://sam.gov/opp/e9dec1233d... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-08:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
- Original Published Date: Feb 09, 2024 04:40 pm PST
- Original Response Date: Mar 04, 2024 02:00 pm PST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Mar 19, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
-
NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
Twentynine Palms , CAUSA
P1241 Communication Towers, Marine Corps Base Twentynine Palms Ranges. MILCON project P1241 constructs new communication towers and restores and modernizes existing communication towers on remote mountaintops or hilltops accessible only by helicopter and lacking any underground utilities such as electricity, water and sewer. It provides the installation’s remote mountain range training area with: 1) the design and construction of four (4) new communication towers coordinated with Naval Sea Systems Command (NAVSEA); 2) the design and construction of the renovation or repairs of seven (7) existing communication towers; 3) the installation of NAVSEA-provided intermodal (ISO) freight container (CONEX) serving as communication equipment shelters; 4) the installation of supporting facilities for each tower; and 5) relocation and/or installation of communication components on the new and existing towers. Special construction challenges include complex construction sequencing and phasing subject to: 1) availability of heavy lift helicopters during the construction period; 2) mandatory work stoppage during fire season months and high wind conditions; 3) intentional work stoppage coordinated with and subject to changes of range training activities; and 4) continuous operation of training and area coverage by the interlinked existing communications systems for the range training area. Construction requires coordination with Government system engineers and system integrators during the equipment installation to ensure the uninterrupted communications coverage. Communication tower design and construction schedule shall be coordinated with NAVSEA’s deployment and migration of the network system. Range area Operation and Maintenance Support Information is included in this project. Site preparation includes demolition, site clearing, grading, earthwork and contaminated soil disposal without the availability of underground utilities such as electricity, water or sewer.
- 750 PACIFIC HIGHWAY
- SAN DIEGO , CA 92132-0001
- USA
- Victor Mariscal
- victor.m.mariscal.civ@us.navy.mil
- Phone Number 6197054657
- Jaime Flores
- jaime.r.flores4.civ@us.navy.mil
- Phone Number 6197054873
- Feb 09, 2024 04:40 pm PSTSources Sought (Original)