Repair of Damaged Wash Rack Pipe at Air Station Sacramento

Agency: HOMELAND SECURITY, DEPARTMENT OF
Level of Government: Federal
Category:
  • 45 - Plumbing, Heating, and Sanitation Equipment
Opps ID: NBD00159877284943113
Posted Date: Aug 11, 2023
Due Date: Aug 14, 2023
Solicitation No: 20290QDL952300156
Source: https://sam.gov/opp/3b757d306f...
Follow
Repair of Damaged Wash Rack Pipe at Air Station Sacramento
Active
Contract Opportunity
Notice ID
20290QDL952300156
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
DOL-9
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Aug 10, 2023 10:46 pm EDT
  • Original Date Offers Due: Aug 14, 2023 10:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Aug 29, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 4510 - PLUMBING FIXTURES AND ACCESSORIES
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:
    Sacramento , CA
    USA
Description

  1. Provide all labor, equipment, and materials to complete the site excavation and repairs to damaged piping to include:

  2. Mobilize manpower and equipment to complete the project in a professional and timely manner complying with all local, state, and federal regulations adhering to OSHA guidelines where applicable.

  3. Install barriers/engineering controls to isolate the work area: Cones, caution tape, signage, etc. as needed during cleanup activities and maintain as needed.

  4. Identify and verify that all utilities wet and dry have been abandoned, locked out and tagged out as necessary prior to clean up.

  5. Supply personal protective equipment (hard hats, goggles, gloves, fall protection, safety vest, etc.) for certified supervisor and cross trained and certified employees throughout the duration of the project.

  6. Load all waste materials for proper disposal and packaged properly according to state and federal regulations.

  7. Leave each work clean and free of debris as feasible and safe at the end of each shift.

  8. Proposal to include all labor, supplies, etc. necessary to complete the project.

  9. Set up negative air containment.

  10. Install 6 mil poly sheeting at all entrances.

  11. Remove and dispose of ACM and non-ACM drywall due to black water flooding throughout the basement.

  12. Bag up contaminated ceiling tiles on the floor caused by flooding and dispose of.

  13. Remove and properly disposal extra drywall at areas that have visual mold on outside surface where occurs.

  14. HEPA vacuum, scrub, wet wipe, and sanitize basement floor using a sanitization mixture to clean existing contaminants due to black water flooding.

  15. Includes cleaning of bottom frame track after drywall remove. Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative.

    1. The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement.

      1. Project is to be completed within 07 days of the contract being awarded.



    2. The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site.

    3. The Contractor shall remove all debris, rubbish and hazardous waste from the job site.

    4. The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection.

    5. The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected.

    6. Unsatisfactory performance shall result in work being re-accomplished at no cost to the government.

    7. It is the contractor’s responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal.




Attachments/Links
Contact Information
Contracting Office Address
  • 300 EAST MAIN STREET
  • NORFOLK , VA 23510
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Aug 10, 2023 10:46 pm EDTCombined Synopsis/Solicitation (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >