Removal of old HVAC and installation of new HVAC unit
Agency: | HOMELAND SECURITY, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159593358191742 |
Posted Date: | Jul 17, 2023 |
Due Date: | Jul 21, 2022 |
Solicitation No: | 20290PR230000235 |
Source: | https://sam.gov/opp/9c138371ee... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Jul 17, 2023 01:28 pm EDT
- Original Date Offers Due: Jul 21, 2022 08:00 am EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Aug 05, 2022
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 2895 - MISCELLANEOUS ENGINES AND COMPONENTS
-
NAICS Code:
- 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
-
Place of Performance:
McClellan , CA 95652USA
STATEMENT OF WORK
Removal of old HVAC and installation of new HVAC unit
For building #1102
(MK SHOP)
USCG Air Station Sacramento
1.0 GENERAL REQUIREMENTS
1.1 PROJECT DESCRIPTION
MK Shop HVAC is not operational, and unit needs to be removed and disposed of for
building 1102 MK Shop. New 5 ton, 3 phase, heat pump unit needs to be delivered,
installed, and tested for correct function. Contractor will verify specifications.
1.1.1 Technical Point of Contact (POC):
MKC Art Castaneda (916-643-7645)
LT James Duhamel (916-643-7684)
1.2 LOCATION
1.2.1 Work to be conducted at USCG Air Station Sacramento.
6037 Price Ave
McClellan, CA 95652
Building #1106
1.3 AIR STATION AND LOCAL REGULATIONS
1.3.1 The work site is on Government property. All rules and regulations issued by
the Commanding Officer covering safety, vehicle operation, and sanitation must
be always observed by the Contractor and his employees.
1.3.2 All personnel employed on site shall keep within the limits of the work and shall
not enter any restricted area unless required or escort by a unit member. The
Contractor’s equipment shall be conspicuously marked for identification.
1.3.3 The Contractor shall control its employee’s traffic on site. Parking for workers
shall be at a suitable location as directed by the Technical POC.
1.3.4 The Contractor shall coordinate work with the technical POC to minimize any
disruption to normal unit operations.
1.4 DAMAGE TO GOVERNMENT PROPERTY
1.4.1 Any damage caused to Government or private property shall be corrected at the
Contractor’s expense.
1.5 SAFETY AND SECURITY
1.5.1 The Contractor shall provide all necessary safety equipment to protect the work
site area. All work shall be performed in accordance with O.S.H.A. Safety
standards to prevent injury to housing occupants, by-passers, or workforce.
1.5.2 Contractor shall comply with Federal and State of California safety and health
regulations. When standards differ, the more stringent shall apply. All accidents
and property damage shall be reported to the Technical POC.
1.5.3 The Contractor shall be responsible for the security of their material, tools, and
equipment. The Government shall not be responsible for their loss.
1.5.4 The Contractor shall comply with all rules and regulations issued by the
National Fire Protection Association covering the use and storage of flammable
mixtures or material which might constitute a fire hazard.
2.0 EQUIPMENT
2.1 Contractor shall provide whatever equipment necessary to complete the inspection and
service of unit boilers.
3.0 SCOPE OF WORK
3.1 Provide all labor, equipment, and materials, to complete the removal of old HVAC unit,
installation, and testing of new 5-ton HVAC unit at building #1102 to include:
1. Lock/Out tag out of power source
2. Disconnect old unit power source and lines
3. Clean any old lines and parts that will stay in place
4. Update electrical components as needed (Thermostat, disconnect switch, etc)
4. Install new 5-ton 3 phase AC and Electrical heat unit
5. Check for leaks (ventilation and refrigerant)
6. Ensure HVAC unit is functioning correctly. (Heating and cooling)
7. Adjust and correct any discrepancies found
8. Remove and dispose of old HVAC unit
3.2 Contractor after inspection shall do a complete test and check for leaks and check for
proper operation.
3.3 Services shall be accomplished between the hours of 0800-1530, Monday-Friday, not to
include federal holidays except as designated by the contracting officer or official
representative.
3.4 The Contractor shall coordinate with the technical POC to schedule a date and time for
project commencement.
3.4.1 Project is to be completed within 07 days of the contract being awarded or as
soon as parts arrive.
3.5 The government shall use a 100% surveillance method. Inspection of work shall be
performed at the time the Contractor is at the site performing its services and prior to
contractor leaving the site.
3.6 The Contractor shall remove all debris, rubbish, and hazardous waste from the job site.
3.7 The Contractor shall keep the Contracting Officer and /or technical POC fully informed
on the daily progress of the work, from the start through completion of this inspection.
3.8 Unsatisfactory performance shall result in work being re-accomplished at no cost to the
government.
3.9 It is the contractor’s responsibility to verify all measurements/dimensions listed above
prior to submitting a quote/proposal.
3.10 Point of contact is MKC Art Castaneda (626-497-6000).
POC email all quotes to
ATTN
Gary Agan (916) 643-7678 Gary.C.Agan@uscg.mil
Christopher Bahn Christopher.A.bahn@uscg.mil
- COAST GUARD ISLAND, BUILDING 52
- ALAMEDA , CA 94501
- USA
- Gary Agan
- Gary.C.Agan@uscg.mil
- Phone Number (916) 643-7678
- CHristopher Bahn
- Christopher.a.bahn@uscg.mil
- Phone Number 9166437674
- Jul 17, 2023 01:28 pm EDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.