LCLS-II-HE Linac & Photon Infrastructure (LPI) - Mechanical, Electrical, Plumbing (MEP) Construction
Agency: | ENERGY, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159049148927279 |
Posted Date: | Mar 13, 2023 |
Due Date: | Mar 17, 2023 |
Solicitation No: | RFP_336210(RH) |
Source: | https://sam.gov/opp/19683963fa... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
- Original Published Date: Mar 12, 2023 10:53 pm PDT
- Original Response Date: Mar 17, 2023 05:30 pm PDT
- Inactive Policy: Manual
- Original Inactive Date: Mar 18, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 6640 - LABORATORY EQUIPMENT AND SUPPLIES
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Menlo Park , CA 94025USA
THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest on the SAM.GOV posting Interested Vendors List, or by emailing the Procurement Specialist for this project.
LCLS-II-HE Linac & Photon Infrastructure (LPI) - Mechanical, Electrical, Plumbing (MEP) Construction
The purpose will be to solicit subcontract support for the modification and reconfiguration to the SLAC LCLS-II-HE Klystron Gallery and Undulator Hall are required for the Mechanical, Electrical, and Plumbing (MEP) systems. The procurement will include labor and materials to complete MEP system modifications during the FY23 short downtime.
The Statement of Work describes the construction requirements. SLAC is seeking an experienced Mechanical, Electrical, and Plumbing (MEP) subcontractor to award a construction subcontract to perform modification of the existing MEP systems and install new systems within the Sectors 7 – 10 areas of the Klystron Gallery (KG) and Linac Housing, Undulator Hall (UH), Building 921 (B921), and Building 913 (B913). Prior to modification construction efforts, the awarded subcontractor shall provide shop drawings and material submittal to SLAC for review, comment, and eventual approval by all Stakeholders and by SLAC’s Building Inspection Office (BIO). BIO will provide approval and release the design for Construction. Subcontractor must submit all Safety and Technical submittals to SLAC for review and approval. Within the requirements of the Subcontract, per the schedule as defined in this Statement of Work, SLAC will issue a formal Notice to Proceed (NTP), and the subcontractor can begin construction
Care must be taken to minimize disruptions and impacts to the active science and lab users during construction.
Potential bidders will need to meet the all necessary criteria outlined in Section L of the draft RFP. A partial list of the criteria required include the following:
1.) A minimum of 3 similar projects completed in the last 5 years of comparable size, scope, and schedule
2.) A local presence in the San Francisco Bay Area established a minimum of three years
3.) An appropriate California current and valid contractor’s license
- 2575 Sand Hill Road
- Menlo Park , CA 94025
- USA
- Ryan Hodges
- rhodges@slac.stanford.edu
- Phone Number 6509263464
- Mar 12, 2023 10:53 pm PDTSources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.