California Bids > Bid Detail
Street Reconstr. and Improvement - Package 3
Agency: | Turlock |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD17105429425973631 |
Posted Date: | Mar 7, 2023 |
Due Date: | Apr 4, 2023 |
Source: | https://www.turlock.ca.us/capi... |
Street Reconstr. and Improvement - Package 3
The work for City Project 22-001 - Package 3 consists, in general, of removal of existing pavement and base, and paving a new Hot Mix Asphalt pavement section along various streets. Work will also include curb, gutter, and sidewalk modifications, ADA ramp construction, adjustment of valve and manhole covers to grade, in-kind replacement of traffic loop detectors, striping, and traffic control.
22-001CON Package 3 4/4/2023 3:00 PM $1,120,000.00 A $50.00 Fred Pezeshk fpezeshk@turlock.ca.us
Supplemental Material:
FIO Package 3_Contours Exhibit (1547.7 KB)
View planholders list Download plans and specifications Print this project
The work for City Project 22-001 - Package 3 consists, in general, of removal of existing pavement and base, and paving a new Hot Mix Asphalt pavement section along various streets. Work will also include curb, gutter, and sidewalk modifications, ADA ramp construction, adjustment of valve and manhole covers to grade, in-kind replacement of traffic loop detectors, striping, and traffic control.
22-001CON Package 3 4/4/2023 3:00 PM $1,120,000.00 A $50.00 Fred Pezeshk fpezeshk@turlock.ca.us
Supplemental Material:
FIO Package 3_Contours Exhibit (1547.7 KB)
View planholders list Download plans and specifications Print this project
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.