P-1238 CONSTRUCTION OF GRID STABILITY & RESILIENCY 10 MW BATTERY ENERGY STORAGE, VARIOUS BUILDINGS AT MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159211272697814 |
Posted Date: | Nov 28, 2022 |
Due Date: | Dec 14, 2022 |
Solicitation No: | N6247322R4005 |
Source: | https://sam.gov/opp/a4b83e5b03... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-08:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
- Updated Published Date: Nov 28, 2022 09:28 am PST
- Original Published Date: Sep 08, 2022 01:08 pm PDT
- Updated Date Offers Due: Dec 14, 2022 02:00 pm PST
- Original Date Offers Due: Oct 12, 2022 02:00 pm PDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Dec 29, 2022
- Original Inactive Date: Oct 27, 2022
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1NZ - CONSTRUCTION OF OTHER UTILITIES
-
NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
Twentynine Palms , CA 92277USA
The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 MW of battery energy storage systems (BESSs) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The BESSs shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the Project P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings at Marine Corps Air Ground Combat Center, Twentynine Palms, California Apr 15, 2022 12:03:02 AM GMT 1 installation's electric distribution system for utility power or on-site cogeneration system charging. The BESSs will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESSs into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESSs capable of parallel operation, each located in proximity to existing PV systems.
- 1220 PACIFIC HIGHWAY
- SAN DIEGO , CA 92132-5000
- USA
- Vincent Nazzal
- vincent.p.nazzal.civ@us.navy.mil
- Nov 28, 2022 09:28 am PSTSolicitation (Updated)
- Nov 07, 2022 09:13 am PST Solicitation (Updated)
- Oct 25, 2022 08:42 am PDT Solicitation (Updated)
- Oct 11, 2022 09:06 am PDT Solicitation (Updated)
- Sep 19, 2022 08:10 am PDT Solicitation (Updated)
- Sep 13, 2022 09:44 am PDT Solicitation (Updated)
- Sep 13, 2022 08:51 am PDT Solicitation (Updated)
- Sep 12, 2022 03:23 pm PDT Solicitation (Updated)